Blog

Embrace the Unexpected — Strategies for Handling Unplanned Work with a Kanban Board14 Apr 2025

One person interrupts another at her desk

In clearly structured workflows — such as those visualized on a Kanban board — unplanned tasks are often treated as disruptive anomalies, intrusions threatening focus, derailing progress, and undermining team efficiency. But, in reality, unplanned work is inevitable. Whether it’s a last-minute stakeholder request, a sudden client issue, or an internal escalation, unexpected tasks will always find their way in.

What separates high-functioning teams from overwhelmed ones is not the absence of interruptions, but the ability to integrate them intelligently—without compromising structure or momentum.

By using a simple, well-thought-out Kanban board, teams can create the necessary flexibility to absorb these tasks without losing clarity, control, or productivity. Here’s how.

1. Designate a lane for unplanned work

The first step will be to acknowledge unplanned tasks as a recurring element—not an exception. Create a dedicated swimlane on your Kanban board labeled Unplanned or Interruptions to allow your team to visually separate this work from their planned initiatives.

Kanban Tool board with an Unplanned swimlane and WIP limits on Doing

Importantly, when pulling unplanned tasks into Doing, be sure to respect the applied Work-In-Progress (WIP) limit, just as you would for others. This helps maintain discipline and forces prioritization. If a new urgent task arrives but the Doing column is full, it prompts a conversation about what can be paused, deferred, or dropped to facilitate the incoming interruption.

2. Classify the nature of the interruption

Not all unexpected tasks warrant immediate attention, and not all are even your responsibility. A simple but effective strategy is to use visual tags or card colors to quickly classify incoming tasks:

  • Urgent: Requires immediate action and may impact business operations.
  • Quick Wins: Low-effort, low-risk items that can be completed swiftly.
  • Needs Clarification: The request lacks context or scope.
  • Out of Scope: Tasks that don’t belong to your team or board, but you need to be aware of their impact.

A simple classification like this allows for faster triage and prevents knee-jerk task switching.

Kanban Tool board with tasks colored to show classes of interruption and a card color legend at the bottom

3. Implement a timeboxed triage process

To avoid reactive decision-making, establish a brief triage process — ideally timeboxed to 10–15 minutes. During this evaluation, determine:

  • What is the task’s true urgency and importance?
  • Who owns it?
  • Can it be deferred, delegated, or documented for later?
An unplanned task with a triage checklist for easy task evaluation

Embedding this step as a built-in checklist within the workflow ensures that decisions around unplanned work are deliberate, not reactive.

4. Maintain prioritization discipline

When an unplanned task is truly urgent, it will have to displace something else. The question is: what? To have meaning, your Kanban board must reflect real capacity. If a task is added to Doing another should move out or be paused.

Man at a desk juggling a phone, a notepad and a portable radio communicator

This forced trade-off keeps the board honest and illustrates the cost of context switching. It also encourages stakeholders to be more thoughtful about last-minute requests when they see what’s being deprioritized to accommodate them.

5. Track and analyze interruptions over time

To turn ad hoc chaos into data-driven insight, establish a routine to track and review unplanned work. Whether through retrospectives or the board's built-in reports, examine:

  • Frequency and volume of unplanned tasks
  • Sources of interruptions
  • Patterns, e.g., recurring departments, times of day, task types.
A breakdown of board tasks by card types

This analysis could surface systemic issues — unclear processes, missing documentation, poor upstream planning — and replace reactive work with strategic improvements.

6. Assign a gatekeeper role

Of course, not every request should earn a place on the board. Assign a team leader or product owner the responsibility to act as a gatekeeper for new inputs. Their role is to ensure alignment with team priorities, prevent scope creep, and protect against unnecessary disruption.

This added layer of control will help preserve team focus while still ensuring valid interruptions are assessed promptly and fairly.

7. Normalize and recognize adaptability

While unplanned work is hardly ideal, the ability to adapt without panic is a mark of a high-performing team. It’s worth recognizing and reinforcing that behavior. Whether through brief showcases in standups or reflection during retrospectives, celebrating well-managed pivots reinforces a culture of structured adaptability rather than reactive firefighting.

Relaxed colleagues laughing at the office

Summing up — structure and flexibility are not opposites!

A Kanban board is not a rigid plan but a living, visual system designed to support real work as it happens. When used intentionally, it doesn’t just show what the team planned to do — it reflects what the team is actually doing, including how it handles the unpredictable.

By thoughtfully integrating mechanisms for unscheduled tasks, teams can retain momentum, focus, and visibility — even when the unexpected arrives.
And it will.

Sign up for a 14-day free trial
to test all the features.

Sign up now and see how we can help
your organization deliver exceptional results.